🚨 MISSION CRITICAL β€’ RAPID DEPLOYMENT
REDS Logo

Rapid Energy Deployment Systems

Power When Every Second Counts

Military-grade, disaster-ready energy solutions deploying in under 30 minutes or less to install. From military outposts to disaster zones, our Guardian E2.0 systems provide immediate, reliable power when traditional infrastructure fails.

Mission-Critical Energy Infrastructure

When disaster strikes or missions deploy, waiting for power is not an option. Our systems are engineered for immediate deployment in the world's most challenging environments.

<30min
Deployment Time
48kWh
Energy Capacity
15kW
Continuous Power
24/7
Runtime Capability

Critical Applications

πŸŽ–οΈ

Military Forward Operating Bases

Rapid power establishment for command centers, communications, and life support in remote deployments

πŸŒͺ️

FEMA Disaster Response

Immediate energy infrastructure for emergency operations, shelters, and relief coordination centers

πŸ”¬

DARPA Research Operations

Reliable, mobile power for field testing, remote labs, and classified operations

πŸ₯

Emergency Medical Facilities

Life-critical power for field hospitals, triage centers, and medical equipment

β›½

Critical Infrastructure

Fuel stations, water treatment, emergency communications, and supply depots

πŸͺ

Supply & Logistics Hubs

Grocery stores, distribution centers, and essential services in affected areas

Guardian E2.0 Rapid Deployment System

Technical Specifications

Specification Details
Energy Capacity 48 kWh (48,000 Wh usable)
Continuous Power Output 15 kW (15,000 W)
Peak Power Output 30 kW surge capability (30 seconds)
Battery Chemistry LiFePO4 (Lithium Iron Phosphate) - Safest, most stable
Cycle Life 16,000+ cycles (10+ years field deployment)
Operating Temperature -20Β°F to 140Β°F (-29Β°C to 60Β°C)
Protection Rating IP67 Waterproof & Submersible - Salt-tight construction
Deployment Time Immediate operation off-truck, <30 minutes for main service connection
Transport Weight ~1,200 lbs (transportable by military vehicle or forklift)
Certifications UL 9540B, UL 1973, FCC Part 15

Power Distribution - Ready to Deploy

⚑
4Γ— 20A Quad Receptacles
16 standard outlets for equipment, lighting, communications
πŸ”Œ
1Γ— 50A Heavy-Duty Outlet
HVAC, kitchen equipment, medical devices
πŸ”‹
1Γ— 30A Outlet
RV/generator integration, specialty equipment
βš™οΈ
50A Generator Input
Seamless integration with military generators

Multi-Source Charging Capability

Designed for operational flexibility - charge from any available power source in the field

β˜€οΈ
Solar PV Arrays
Silent, emission-free charging for sustained operations
⚑
Military Generators
Rapid recharge from diesel, propane, or natural gas generators
πŸ’¨
Wind Turbines
24/7 charging capability in suitable locations
πŸ”Œ
Grid/Shore Power
Standard utility connection when available
🚚
Vehicle Integration
Charge from military vehicle alternators during transport
πŸ”„
Hybrid Operations
Simultaneously charge and discharge - uninterrupted power

Rapid Deployment Protocol

T+0 Minutes: Off-Load & Position

System off-loaded from transport vehicle via forklift or crane. Position at deployment site. Unit is immediately operational at this stage with built-in receptacles.

T+15 Minutes: Initial Power-Up

Connect critical loads to quad receptacles (4Γ—20A). System provides immediate power for communications, lighting, computers, and essential equipment.

T+30 Minutes: Generator Integration (Optional)

Connect 50A generator input for hybrid operation or battery charging. System manages power flow automatically.

T+45 Minutes: Solar/Wind Connection (If Available)

Integrate renewable charging sources for sustained operations without fuel resupply requirements.

T+15-30 Minutes: Main Service Connection

For permanent installations: Complete safety checks and wire into facility main electrical service. Full building power capability achieved.

Investment & Pricing

Standard Retail Price
$28,249

Per Guardian E2.0 Rapid Deployment Unit

Emergency Services & Government Pricing

Special pricing available for:

βœ“ FEMA Emergency Response
βœ“ Department of Defense
βœ“ DARPA Research Programs
βœ“ State Emergency Management
βœ“ Critical Infrastructure Operators
βœ“ Federal Agencies

Contact for volume discounts and emergency service pricing

Bulk Deployment Packages

Package Size Units Total Capacity Applications
Forward Operating Base 5-10 units 240-480 kWh Military outpost, command center, communications hub
Disaster Relief Zone 10-25 units 480-1,200 kWh FEMA staging area, multi-site emergency response
Critical Infrastructure Grid 25-50 units 1.2-2.4 MWh Hospital, fuel depot, water treatment, logistics center
Regional Response Network 50+ units 2.4+ MWh State emergency management, military theater operations

Why Guardian E2.0 for Emergency Operations

πŸ›‘οΈ
Battle-Tested Durability
IP67 waterproof, salt-tight construction survives floods, dust storms, and extreme conditions
πŸ”₯
Extreme Temperature Operation
-20Β°F to 140Β°F range handles Arctic to desert deployments
⚑
Instant Power Delivery
No warm-up required - full power available the moment you need it
πŸ”‹
LiFePO4 Safety Profile
Most stable lithium chemistry - no thermal runaway risk in combat/disaster zones
πŸ”‡
Silent Operation
Zero noise signature - critical for tactical operations and medical facilities
♻️
No Fuel Logistics
Solar/wind charging eliminates dangerous fuel convoys and supply vulnerabilities
πŸ“‘
Clean Power Quality
Pure sine wave output protects sensitive electronics, medical devices, communications
πŸ”§
Minimal Maintenance
No oil changes, fuel filters, or scheduled maintenance - focus on mission, not equipment
πŸ“±
Remote Monitoring
Real-time status, energy levels, and diagnostics via cellular/satellite connection
πŸ‡ΊπŸ‡Έ
Made in USA
Licensed contractor - Domestic manufacturing for secure supply chain

Real-World Deployment Scenarios

Scenario 1: Hurricane Relief Operations

Challenge: Category 4 hurricane destroys electrical grid across 200-mile coastal region. 500,000 residents without power. Fuel stations non-operational.

Solution: FEMA deploys 25 Guardian E2.0 units within 24 hours:

  • 5 units power emergency operations center
  • 10 units restore fuel station operations (pumps, payment systems, lighting)
  • 8 units power field hospitals and medical triage
  • 2 units enable grocery store refrigeration and operations

Result: Critical infrastructure operational in 48 hours vs. 7-14 days for grid restoration

Scenario 2: Remote Military Forward Operating Base

Challenge: Establish 200-person forward operating base in remote desert region with no infrastructure. Daily fuel convoys present major security risk.

Solution: Deploy 8 Guardian E2.0 units with solar arrays:

  • 384 kWh total storage capacity
  • 120 kW continuous power delivery
  • Daytime solar charging eliminates 90% of fuel needs
  • Silent operation maintains tactical security

Result: Base operational in 3 days. Fuel convoy requirement reduced from daily to weekly. Zero generator noise signature.

Scenario 3: Wildfire Evacuation & Emergency Services

Challenge: Wildfire threatens mountain community. Power grid preemptively shut down. Emergency services must maintain operations during evacuation.

Solution: Pre-position 6 Guardian E2.0 units:

  • 2 units power fire station and emergency dispatch
  • 2 units maintain police department and communications
  • 2 units keep evacuation staging area operational (lighting, water pumps)

Result: Emergency services maintain 100% operational capability through 5-day evacuation with zero generator fuel required

Ready to Deploy Mission-Critical Energy?

Whether you're planning for disaster response, military operations, or critical infrastructure protection, Guardian E2.0 provides the reliable, rapid-deployment power your mission demands.

Request Emergency Services Pricing
Emergency Services Sales
rapid-deployment@reds911.us
Government Contracts
government@reds911.us
24/7 Deployment Hotline
(858) 544-0227
Rapid Energy Deployment Systems
Licensed Electrical Contractor

Startup Capital Requirements

To establish REDS (Rapid Energy Deployment Systems) as a specialized division targeting emergency and defense markets, we're seeking strategic investment to scale production and market penetration.

Seeking Investment

Capital raise to establish emergency deployment infrastructure and capture defense contracts

Investment Allocation

Category Purpose Strategic Value
Inventory & Manufacturing Pre-position 100 Guardian E2.0 units for immediate deployment Enables rapid response to disaster/military contracts with <24hr delivery
Certifications & Compliance MIL-SPEC certifications, GSA Schedule registration, FEMA approval process Unlocks federal procurement and defense contracts
Strategic Partnerships Partnerships with disaster response organizations, military logistics providers Direct access to emergency procurement channels
Mobile Demonstration Units Equipped vehicles for on-site demonstrations at military bases and emergency management conferences Prove deployment speed and capabilities to procurement decision-makers
Field Service Network Regional deployment teams with rapid response capability Support 24/7 emergency deployment anywhere in continental US
Government Relations Washington DC presence, DARPA/FEMA relationship development Position for major federal contracts and R&D funding

Market Opportunity

$8.5B
Annual Federal Emergency Management Budget
$750B
Department of Defense Budget (Energy Infrastructure)
75+
Major Natural Disasters Annually (US)
800+
US Military Installations Globally

πŸ“š Complete Investment Package

🎯
Federal Government Pitch
FEMA, DARPA, Senators
πŸ“„
Executive Summary
1-page Guardian overview
πŸ“Š
Technical Comparison
Guardian vs generators
πŸ“‹
Proposal Template
Custom client proposals
🏒
Capability Statement
Federal contracting
Rapid Energy Deployment Systems β€’ investor.relations@reds911.us β€’ San Diego, California
0
Skip to Content
Rapid Energy Deployment Systems (REDS)
REDS911
Federal defense investment package
Guardian vs generator comparison
Rapid Energy Deployment Pitch
Rapid Energy Deployment Systems (REDS)
REDS911
Federal defense investment package
Guardian vs generator comparison
Rapid Energy Deployment Pitch
REDS911
Federal defense investment package
Guardian vs generator comparison
Rapid Energy Deployment Pitch